1. Gutted the entry way. This was the bulk of the work for the first 3 days and included taking down the wall to expose the stairway, removing the wall between the entry way and the living room, exposing the pocket doors, and taking down most of the walls to the existing bathroom.
Painting, painting, painting...the girls took on the monstrous task of painting both the living room and dining room. We went with a brilliant green that blends sharply with the rich red trimwork throughout the main level.
Trever took on the difficult task of re-outfitting the front door with a new knob and deadbolt. This is not as easy as it sounds. The old door had an original skeleton key setup that was not working. New "antique" door lock sets are outrageously expensive, so Trever cut and fitted a piece of wood into the old locking slot and redrilled the door hardware. A very nice job.

There were many other projects going on throughout the days including electrical, plumbing, framing, drywalling, and decorating. Here are some fun shots from all the hard work.
Keith's awesome electrical skills.

Dad and Trever...

Jason and Trever working out the plumbing...

Hard working guys...

The ladies grabbing a breather after a long day of painting...

A fine bunch...

Cleaning up...

So now we have an open stairway, exposed beautiful pocket doors, a painted living room and dining room, a framed in bathroom, rewired basement, replumbed basement, and a working front door. We still have to finish hanging the pocket door for the new bathroom, drywall everything, paint the new drywall, and get the floors refinished (to name a few projects). We have a long way to go but we covered a lot of ground in a short time. Thanks again to everyone for all of their hard work.
There were many other projects going on throughout the days including electrical, plumbing, framing, drywalling, and decorating. Here are some fun shots from all the hard work.
Keith's awesome electrical skills.
Dad and Trever...
Jason and Trever working out the plumbing...
Hard working guys...
The ladies grabbing a breather after a long day of painting...
A fine bunch...
Cleaning up...
So now we have an open stairway, exposed beautiful pocket doors, a painted living room and dining room, a framed in bathroom, rewired basement, replumbed basement, and a working front door. We still have to finish hanging the pocket door for the new bathroom, drywall everything, paint the new drywall, and get the floors refinished (to name a few projects). We have a long way to go but we covered a lot of ground in a short time. Thanks again to everyone for all of their hard work.
Wow you got a lot done! Thanks for the pictures. It's really fun to get a peek at your house.
ReplyDeleteLove,
Ellen